Note 01
The suburb the Airport Line rebuilt
High Wycombe station opened in 2022 at the end of the line out from Bayswater, and the precinct around it has been redeveloping since. Zoning lifted, apartments appeared, and older houses on big lots started to split.
Two patio briefs came out of that. The tight one, on a new survey-strata lot with a courtyard and a boundary wall, and the generous one, on an original 1970s block nobody has touched.
They need different structures. One is a short-span roof squeezed between fixed constraints, the other is a proper outdoor room where the only real question is how much of the yard to cover.




