Site measure and documentation
The install starts weeks before anyone arrives with tools. We measure the fascia height at both ends, take levels across the ground, locate services and note the existing roof type and pitch.
Those numbers drive everything downstream. The roof fall, the beam height above the paving, the post lengths and the flashing detail all come out of the measure rather than an assumption.
You get drawings to check. If the head height at the front beam is going to be lower than you pictured, that is the moment to find out.